Event power demand calculator
Pick everything on your site that needs power – from the stage to the cold room. The calculator estimates the load with simultaneity, the current per phase, a suitable generator and the diesel consumption per day.
- Free
- No sign-up
- Your input stays in your browser
Pick your consumers
Tap to add one, use − and + to change the count.
Stage & tech
Food
Drinks & cooling
Sanitary
Operations
Lighting
Camping
Rides
Recommended generator
?
Pick the consumers of your event on the left.
A planning aid using typical values of common rental equipment. A qualified electrician plans, installs and inspects the installation.
How the calculator estimates your power demand
Every consumer has a typical rated power in kilowatts. Because devices never all run at full load at the same time, the calculator multiplies each value by a simultaneity factor – different for a stage than for a cold room. Real power becomes apparent power with a power factor (cos φ) of 0.9.
Cooling units, pumps and rides draw a multiple of their rated current when starting. The calculator therefore keeps an extra reserve for the largest motor start.
- Demand (kVA) = Σ kW × count × simultaneity ÷ 0.9
- Current per phase = kVA × 1000 ÷ (√3 × 400 V), evenly distributed
- Generator = smallest common size loaded to at most 80 % that also handles the largest start
Why 80 % and not 100 %?
A generator running at its limit all the time is risky: peaks, unbalanced phases and starting currents quickly cause an outage – in the middle of the headliner's set. A reserve of around 20 % is therefore common.
Too big is not good either: if a diesel generator runs below about 30 % load for long, the engine burns incompletely and soots up. A smaller generator, several sources or a grid connection is then the better choice.
Diesel consumption and CO₂
Consumption is made up of a base consumption that depends on the generator size and a load-dependent part. For CO₂ we use 2.65 kg per litre of diesel. Use the slider to set how many hours a day the power runs.
From the calculator to a power plan
The total tells you which size range to rent. A real plan needs more: where do the distribution boxes go, which cables cover which distance, how does the load split across the phases? A power plan on your site map answers these questions.
- Place consumers on the map instead of counting them in a list.
- Check cable lengths, voltage drop and phase load per run.
- Derive the material list for the rental company.
The matching tools in Alpha Events
In the Alpha Events site map you place consumers on the real map, connect them to distribution boxes and generators and see load, cables and warnings live.
Frequently asked questions
Questions about power planning for concerts, open airs and festivals.
Start for freeHow big does the generator for my festival need to be?
Where do the kW values come from?
What does current per phase mean?
Does the calculator replace electrical planning?
Your next event deserves better tooling.
Create a free account and explore every feature. Only pay for what you actually use.
- Free account
- No credit card
- No subscription
- Servers in Germany · GDPR